The roads from Vancouver to Lethbridge ought to be something else, I'm sure. However, we begin the long haul back tonight, and hopefully I'm in Lethbridge by about, oohhhh... 8AM... so what does that mean?
It means that tomorrow I'll be cleaning out the rest of the existing crap from the floor. Insulating it from sound. Throwing down the initial carpet. Monday, by Monday night, I hope to have the new floor shape figured out, and pieces cut. Then, come Tuesday, install the new carpet, which will allow me to then throw in the floor console, shifter, the whole nine yards of what I was working on.
Although the subframe is finished, which I'm quite happy about, I'll have to do the remainder of the panels when I'm in Shilo, so weekend projects. BUT, all in all, with all the minor details, should be carpeted and with a finished floor on or around Tuesday night.
One of those small detailes I was thinking about, was having a 3-prong plug installed somewhere around the floor area, to finally avoid all the converters and adaptors that have to deal with a cigarette lighter... basically the AC adaptor for my laptop...
Anyway, hopefully there's no hickups on the drive back... and I can get something accomplished. I'll be sure to throw on some updates ASAP... picture updates that is.
__________________
"What are you doing to your car that's taking it so long?"
-Everything
"Why an Alero?"
-Why the hell not?
|